Moutier Tunnel

The 1.2 km long twin tube Moutier Tunnel forms part of the A16 motorway, called Transjurane. This motorway connects the city of Biel to the French motorway network, crossing the mountainous Jura area. The tunnel crosses a geologically complex region with high tectonic stresses.

The tunnelling was mostly done using conventional mechanical machinery, i.e. rock splitters and hydraulic hammers. Safe support to the tunnel lining is provided by steel beams and sprayed concrete. In particularly difficult zones, tube shields were used and the cross-section had in some areas to be divided into 7 sub-sections for excavation.

Ort
Highway A16, Transjurane
Kunde
Public Works Authority of the Canton of Berne
Zeitraum
2000
2011
Tätigkeitsfelder
Infrastructure;Road engineering;Underground construction / geotechnics
Erbrachte Leistungen
Preliminary study
Building project
Tender process
Execution planning
Construction supervision
Charakteristische Angaben
Length: 2 x 1.2 km
Cross-section: 107-149 m2
Building costs: 300 Mio. CHF