Operational scenarios for a new traffic management system in Norway
The Norwegian railways are replacing all signalling assets until 2030 and are introducing ETCS level 2 at the same time. A first step is the network-wide introduction of a new traffic management system, in order to replace the inefficient patchwork of existing traffic management systems and locally controlled stations.
To obtain a basis for tendering and design of the new traffic management system, it was necessary to set up operational scenarios that describe how the new traffic management system will be used to deal with operational situations under the legacy signalling systems and ETCS level 2.
Oslo
Jernbaneverket (from 01.01.2017 Bane NOR)
Definition methodology and framework of the scenario development
Execution of workshops to identify the contents for the scenario description
Consultation of the customer organisational unit and revision of the description
Network length: approx. 4000 km, mostly single track
Passengers in 2010: 58 millions
Freight in 2010: 27 millions of tonnes