References

Please find more references on the German version of the site.

2012
2021

Development of Advanced Traffic Management and Decision Support Functionality for Rail Networks

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Tender Specification

Tender Evaluation

Lead in Requirements Clarification

Lead in Process Design by means of a Process Lab

Review of System and Subsystem Requirements (approx. 3000 requirements)

Support of the Customer in Cases of Differences with the Suppliers

Elaboration of Business Change Documentation for the Customer

Alignment between Research and Supplier

Alignment between Banedanmark and DSB, the principal Operator of danish long distance passenger services

Elaboration of Detailed Use Cases

1990
2021

Test and Commissioning Activities in ETCS Signalling Projects

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Consultancy service for test and commissioning, including elaboration of related overall concepts.
Verification of Suppliers’ test and commissioning documents
Supervision of test and commissioning activities
2009
2017

ETCS Gotthard Base Tunnel, Detailed Design and Realisation Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Supervising the contractor

Assistance to the Client (ATG)

Technical support

Project management

Verification of the RAMS process

Cost controlling

2009
2011

ETCS Level 2 Denmark, Traffic Management

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Description of Customer’s service perception
Design of Traffic Management Processes
Description of roles of all the stakeholders and their representation on the TMS
Description of a proper Decision Support System
Outline the Workflow at the Control Centre
Setting up Interfaces to other systems
Overall design and configuration of Control Centre
2023
2024

Preliminary study at Rhaetian Railway (RhB)

Mobility and traffic
Rail systems
Investigation and definition of feasible variants in accordance with FOT specifications for the migration and further development of the ZBMS standard for the signalling and train control system
Evaluation of the technical feasibility and possible risks for the respective variants
Preparation of cost-benefit analyses and possible migration strategies to the target system
Submission of an expert recommendation regarding the best variant
Kick-off and several interim workshops with relevant RhB employees
Preparation of a questionnaire
Presentation of the results of the preliminary study to the FOT
2021
2024

Rehabilitation of the OTIF head office, Bern

Real estate
Construction fiduciary & project management
Real estate consulting
Construction management
MEP & sustainability consulting
Cost consulting
Quality assurance for real estate
BIM
Owner representation and owner trusteeship
Building inventories
Potential analysis and variant studies
General planning tender
Leadership and control of the planning team
Deadline and cost control
Project reporting with risk analysis
Quality assurance of the execution
Acceptance and handover to customers
2023

Cogwheel railway to the Pilatus

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Rail vehicles
Assessment of ICT security according to CLC/TS 50701
Definition of the overall system to be analysed
Breakdown of the overall system into zones and conduits
Hazard analysis and interface analysis
Identification of threat scenarios
Risk assessment of the threat scenarios
Recommendations for assuring cyber security during operation
2022

Assessment of the ICT security of a railway infrastructure

Mobility and traffic
Rail systems
Safety / RAMS
Definition of the system to be analysed
Subdivision of the overall system into zones and conduits
Hazard and interface analysis
Identification and risk assessment of threat scenarios
Recommendations for ensuring cyber security in operations
Practical solution for effective risk minimisation at low cost
2019
2021

New logistics center Bülach - UPS Center Zurich

Real estate
Construction fiduciary & project management

Owner representative (in line)

Setting up the organization in close cooperation with the client and the user

Leading the client meetings, management of pending issues and obtaining decisions

Risk reporting (planning quality / costs / deadlines)

Coordination of the total contractor and the tenant

Advice to clients on financial and construction issues

Management of reporting and cost control

2010
2021

ETCS Ceneri Base Tunnel, Tender and Realisation Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Submission documents

Offer evaluation

Assistance during procurement

Supervising the contractor

Assistance to the Client (ATG)

Technical support

Project management

Verification of the RAMS process

Cost controlling