ETCS Level 2 Denmark, Preliminary Design Study and Migration Planning
Feasibility study, preliminary project and migration scenario for the by Banedanmark proposed networkwide migration of the existing, partly obsolete signalling, to the new European train control system ETCS level 2. Despite the train control system interlockings and central control shall be replaced too.
The service contract was executed in a joint venture with Rambøll (DK) and R+R Burger und Partner (CH). Emch+Berger AG Bern has been essentially responsible for the technical expertise. This included the development and application of models for the quantitative recording and evaluation of the new signalling system as well as the development of realistic migration scenarios based on predetermined financing strategies.
Banedanmark (DK, Copenhagen)
Generation of the technical data base
Evaluation of available technology
Development of appropriate models for quantification
Development of Migration-Scenarios
Development of maintenance models
Assistance in cost modelling
Market surveys
Line length: 2'100 km
Track length: 3'200 km
Max. speed: 200 km/h
Headway: 3 min. on main lines
Train control system: ETCS level 2
RBC with interface to GSM-R-netzwork: approx. 40
Interlockings: approx. 20
Balises: approx. 3'000
Control centres: 2 equipped with state-of-the art control systems