ETCS Gotthard Base Tunnel, Tender Train Control and Signalling System
Concept, design and specification (incl. use cases and hazard analysis) of the new train control and signalling system for the Gotthard line on behalf of AlpTransit Gotthard AG.
The contract included the tender specification- and offer evaluation phase as well as options for the realisation phase and additional works like the study of alternative routes in the northern part of the tunnel.
The project is carried out by a consortium under the lead of Emch+Berger AG Bern. The system has been specified in a complex environment with many interfaces to other systems where the use of new technologies, open interface requirements, modularity, operational safety, interoperability, cost budgets and adherence to international and national standards have been set conditions to be met.
The specifications included:
- Central Control System
- Train control (ETCS level 2)
- Interlockings
- System Integration
AlpTransit Gotthard AG, Lucerne
Signal plan
System layouts
Submission documents
Offer evaluation
Assistance during procurement
Document management
Two separated running tunnels: 57 km
Train speed: 80-250 km/h
Headway: 3 min
Train control system: ETCS level 2
RBC with GSM-R interface: 3
Interlockings: 4
Balises: approx. 370
Central Control System: 1