Back to overview

ETCS Gotthard Base Tunnel, Tender Train Control and Signalling System

Concept, design and specification (incl. use cases and hazard analysis) of the new train control and signalling system for the Gotthard line on behalf of AlpTransit Gotthard AG.
The contract included the tender specification- and offer evaluation phase as well as options for the realisation phase and additional works like the study of alternative routes in the northern part of the tunnel.

The project is carried out by a consortium under the lead of Emch+Berger AG Bern. The system has been specified in a complex environment with many interfaces to other systems where the use of new technologies, open interface requirements, modularity, operational safety, interoperability, cost budgets and adherence to international and national standards have been set conditions to be met.
The specifications included:

  • Central Control System
  • Train control (ETCS level 2)
  • Interlockings
  • System Integration
Client

AlpTransit Gotthard AG, Lucerne

Period
2004
2008
Fields of activity
Infrastructure;Rail infrastructure;Mobility and traffic;Rail systems
Delivered services

Signal plan

System layouts

Submission documents

Offer evaluation

Assistance during procurement

Document management

Specifications

Two separated running tunnels: 57 km

Train speed: 80-250 km/h

Headway: 3 min

Train control system: ETCS level 2

RBC with GSM-R interface: 3

Interlockings: 4

Balises: approx. 370

Central Control System: 1