References

Please find more references on the German version of the site.

2012
2021

Development of Advanced Traffic Management and Decision Support Functionality for Rail Networks

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Tender Specification

Tender Evaluation

Lead in Requirements Clarification

Lead in Process Design by means of a Process Lab

Review of System and Subsystem Requirements (approx. 3000 requirements)

Support of the Customer in Cases of Differences with the Suppliers

Elaboration of Business Change Documentation for the Customer

Alignment between Research and Supplier

Alignment between Banedanmark and DSB, the principal Operator of danish long distance passenger services

Elaboration of Detailed Use Cases

1990
2021

Test and Commissioning Activities in ETCS Signalling Projects

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Consultancy service for test and commissioning, including elaboration of related overall concepts.
Verification of Suppliers’ test and commissioning documents
Supervision of test and commissioning activities
2009
2017

ETCS Gotthard Base Tunnel, Detailed Design and Realisation Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Supervising the contractor

Assistance to the Client (ATG)

Technical support

Project management

Verification of the RAMS process

Cost controlling

2009
2011

ETCS Level 2 Denmark, Traffic Management

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Description of Customer’s service perception
Design of Traffic Management Processes
Description of roles of all the stakeholders and their representation on the TMS
Description of a proper Decision Support System
Outline the Workflow at the Control Centre
Setting up Interfaces to other systems
Overall design and configuration of Control Centre
2023
2024

Preliminary study at Rhaetian Railway (RhB)

Mobility and traffic
Rail systems
Investigation and definition of feasible variants in accordance with FOT specifications for the migration and further development of the ZBMS standard for the signalling and train control system
Evaluation of the technical feasibility and possible risks for the respective variants
Preparation of cost-benefit analyses and possible migration strategies to the target system
Submission of an expert recommendation regarding the best variant
Kick-off and several interim workshops with relevant RhB employees
Preparation of a questionnaire
Presentation of the results of the preliminary study to the FOT
2023

Cogwheel railway to the Pilatus

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Rail vehicles
Assessment of ICT security according to CLC/TS 50701
Definition of the overall system to be analysed
Breakdown of the overall system into zones and conduits
Hazard analysis and interface analysis
Identification of threat scenarios
Risk assessment of the threat scenarios
Recommendations for assuring cyber security during operation
2022

Assessment of the ICT security of a railway infrastructure

Mobility and traffic
Rail systems
Safety / RAMS
Definition of the system to be analysed
Subdivision of the overall system into zones and conduits
Hazard and interface analysis
Identification and risk assessment of threat scenarios
Recommendations for ensuring cyber security in operations
Practical solution for effective risk minimisation at low cost
2010
2021

ETCS Ceneri Base Tunnel, Tender and Realisation Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Submission documents

Offer evaluation

Assistance during procurement

Supervising the contractor

Assistance to the Client (ATG)

Technical support

Project management

Verification of the RAMS process

Cost controlling

2006
2021

Network wide renewal of signalling and traffic management systems

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Within the Rambøll-Atkins-Emch+Berger-Parsons joint venture, Emch+Berger has provided the following main services:

Feasibility study: leading the technical and safety work stream; provide input to many key findings on how to achieve such a large migration within a reasonable time frame without disturbing daily operations; setting up a model counting the new signalling assets as a basis for the budget

Procurement phase: Technical project management of the elaboration of the tender documents and the bid assessment, providing contents for several disciplines, writing of the bid assessment reports

Design phase: Key contribution to management of design and development; discipline leadership in traffic management, automated dispatching, timetabling, signalling design to capacity, development of use cases covering the entire railway operation, ETCS level 2, testing; management of project controls; key inputs to the identification of business changes within Banedanmark

2016

Operational scenarios for a new traffic management system in Norway

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Definition methodology and framework of the scenario development

Execution of workshops to identify the contents for the scenario description

Consultation of the customer organisational unit and revision of the description

2007
2015

Büttenberg Tunnel

Infrastructure
Road engineering
Underground construction / geotechnics
General project management
Planning through all project phases from concept to realisation
Tender process, bid evaluation and award of contract
Execution planning
Construction logistics and material management
Site management
2012
2013

Preliminary Design of Centralised Traffic Control System and operational rules

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Tender Specification

Tender Evaluation

Lead in Requirements Clarification

Lead in Joint Design (to converge and interface the two products)

Review of System and Subsystem Requirements (requirement specifications were delivered by the suppliers covering approx. 2000 requirements each)

Support oft he Customer in Cases of Differences with the Suppliers

Elaboration of Business Change Documentation for the Customer

2010
2011

Preliminary Project Tramway Tampere

Infrastructure
Rail infrastructure
Mobility and traffic
Public transport
Rail systems

Definition of targeted customer perception together with the client

Tram routing, evaluation of variants

Overall network concept

Shaping of stops and transfer stations, integration to streets

Cost calculation, effects on City development

Communication, involvement of the public

2009
2011

ETCS Level 2 Denmark, Submission Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Technical concepts

Conceptual timetable 2020

Requirements / specifications

Comprehensive technical requirements

Submission documents

Offer evaluation

2000
2011

Moutier Tunnel

Infrastructure
Road engineering
Underground construction / geotechnics
Preliminary study
Building project
Tender process
Execution planning
Construction supervision
2009
2010

ETCS Level 2 Denmark, Concept Timetable 2020

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Gather future concepts

Evaluate future pinch points

Set up detailed timetable for 2020

Benchmark trip time and interval

Define required headways

Define requirements toward TMS

Define infra extension modules

2008
2009

Olympic Games Sochi 2014 - Logistics

Infrastructure
Rail infrastructure
Development of logistic chains
Development of external transport modes
Risk analysis
Proposals to centralise the control and management of freight logistic systems
Proposals on common information environment
Proposals on a passenger transportation centre
2008
2009

Railway Connection Voronezh - New International Airport

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems
Proposal on transport system and organisation
Definition of different scenarios
Model assessment
Global cost estimation (LCC-basis)
Revenue estimation / phase
Assessment and development of a PPP approach
Proposal on project schedule
Elaboration on traffic planning during construction phases
2008
2009

SBB Bahnhof Lucerne Pedestrian Simulation

Infrastructure
Regional development & urban planning
survey pedestrian movement
development origin destination matrix
behavioural modelling
pedestrian movement
measures
2008
2009

SBB Bahnhof Lucerne Pedestrian Simulation

Infrastructure
Regional development & urban planning
survey pedestrian movement
development origin destination matrix
behavioural modelling
pedestrian movement
developments of measures
2004
2008

ETCS Gotthard Base Tunnel, Tender Train Control and Signalling System

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Signal plan

System layouts

Submission documents

Offer evaluation

Assistance during procurement

Document management

2005
2008

ETCS Level 2 Denmark, Preliminary Design Study and Migration Planning

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Generation of the technical data base

Evaluation of available technology

Development of appropriate models for quantification

Development of Migration-Scenarios

Development of maintenance models

Assistance in cost modelling

Market surveys

2001
2008

Wankdorfplatz

Infrastructure
Civil engineering structures
transport and logistic conception
conception of the construction progress
verification of the capacities
microscopic traffic simulation
traffic management
accompanying measures
2003
2008

Gotthard Base Tunnel, Logistics for the installation of railway technology

Infrastructure
Underground construction / geotechnics
Rail infrastructure
Real estate
Construction fiduciary & project management
Construction management
Construction project, incl. cost estimations
Tender process, bid evaluation and award of contract
Assessment of the execution planning
Project quality management (PQM) for the entire project
Planning and tendering of construction site safety
Supervision of the execution incl. PQM (pending)
2006
2008

Pedestrian Simulation SBB Station Berne

Infrastructure
Regional development & urban planning
concept of the multi agent system
modelling concept of pedestrian movement
modelling concept of evacuation behaviour
simulations
analysis and evaluation of the results
development of measures
recommendations
2007
2008

Evacuation Simulation of a Train in a Tunnel

Infrastructure
Regional development & urban planning
evacuation simulation
study of variants
behavioural modelling
2007
2008

Evacuation Simulation of a Train in a Tunnel

Infrastructure
Regional development & urban planning
evacuation simulation
modelling concept of evacuation
behavioural modelling
study of variants
development of measures
2006
2008

Pedestrian Simulation SBB Station Berne

Infrastructure
Regional development & urban planning
concept of the multi agent system
modelling concept of pedestrian movement
modelling concept of evacuation behaviour
simulations
analysis and evaluation of the results
development of measures, recommendations
1999
2008

Westside - leisure and shopping centre

Real estate
Construction management
transport forecast, traffic modelling
micro simulation traffic flows
transport development concept
parking concept
accompanying measures
logistics (construction zone)
traffic coordination
traffic management
2005
2008

Noise barrier (Sound protection walls) SBB

Energy and environment
Environmental sustainability
Co-ordination of works
Design, Engineering
Submission specification
Realisation planning
Site management
Works scheduling
2005
2008

öBL Umfahrung Emdthal

Infrastructure
Road engineering
Örtliche Bauleitung nach Honorarordnung SIA 103
2004
2007

Renewal Visp station

Infrastructure
Rail infrastructure
Project co-ordination
Submission documents
Realisation planning and project
Project and site management
Design and engineering
Work scheduling
Commissioning, Acceptance
2005
2006

Renovation Seetalbahn, Level Crossing Ballwil Nord

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Construction project

Bid comparison

Participation and recommendations in awarding of contacts

Realisation project

Management of the execution of construction works

Commissioning

Management of tests, approvals and acceptance

2004
2005

Berne - Neuchâtel Line: Project Studies and Plannings for Double Tracks

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Project proposal Rosshäusern - Mauss

Project study Mauss - Gümmenen

1995
2003

Bahn 2000, New Line Mattstetten - Rothrist

Infrastructure
Rail infrastructure
Co-ordination
Submission documents
Realisation planning and project
Project and site management
Design and engineering
2001
2002

PULS 90 Network Planning: Alternative to Additional Tracks and Flyovers

Infrastructure
Rail infrastructure
Mobility and traffic
Rail systems

Conceivable service offer train quantities

Define connectivity concept

Calculate minimal headways

Conflict-free timetable on lines

Track occupation in node

Simulation of operational behavior

Comparison of costs

1998
2002

EXPO.02 Strategic and operational Transport Concept

Infrastructure
Regional development & urban planning
transport demand modelling
traffic simulation
transport concept
transport management
development of special measures, recommendations